Try an author, a thought, or a phrase in “quotes”.↑ ↓ Navigate · Esc Close

Type a word, saying or author to search.

Browse the library ↗

Eternity is said not to be an extension of time but an absence of time, and sometimes it seemed to me that her abandonment touched that strange mathematical point of endlessness, a point with no width, occupying no space.

Eternity is said not to be an extension of time but an absence of time, and sometimes it seemed to me that her abandonment touched that strange mathematical point of endlessness, a point with no width, occupying no space.

Approximate author period: c. 1947 AD · modern

Meaning not yet available

An individual explanation has not yet been added. We do not substitute a generic description for an interpretation of these particular words.

Begin with source-checked readings and explanations ↗
Attribution & collection notes
Author or tradition
Graham Greene
Attribution: attributed
Country attributed
Not established
A country attribution does not establish the earliest origin.
Historical period
Approximate author period: c. 1947 AD · modern
Approximate author-period anchor from life dates 1904 to 1991; Wikidata Q128560, https://www.wikidata.org/wiki/Q128560 (accessed 2026-10-08). Not a quotation composition date.
An author lifetime, approximate period or collection date is not necessarily the date when these words were first written or spoken.
Recorded source
Contributor-provided quotation collection

Supplied reference C; CSV row 56557; supplied attribution, independently unverified

A collection's publication date can be later than the words it records.